How much concrete do I need?
Work out the volume in cubic feet, then divide by 27 to get cubic yards — ready-mix concrete is sold by the cubic yard. Always add 10% for waste, spillage and an uneven subgrade, so you do not run short mid-pour.
Bag yields
Bagged concrete is sold by weight, and each bag yields a fixed volume (Quikrete yields):
| Bag size | Yield |
|---|---|
| 40 lb | 0.30 cu ft |
| 50 lb | 0.375 cu ft |
| 60 lb | 0.45 cu ft |
| 80 lb | 0.60 cu ft |
Worked example
A 10 × 10 foot slab, 4 inches thick, is 10 × 10 × (4 ÷ 12) = 33.33 cubic feet, or 33.33 ÷ 27 = 1.23 cubic yards. With the 10% waste allowance that is 1.36 cubic yards, which needs 82 bags of 60 lb concrete.
When to order ready-mix
Over about 1 cubic yard, ready-mix is usually cheaper than bags — and far less labour. The example slab needs 82 bags of 60 lb concrete, which is a lot of mixing by hand. Under 1 cubic yard, bags are practical.
Frequently Asked Questions
How many cubic yards in a 10×10 slab 4 inches thick?
1.23 cu yd (1.36 with waste).
How many 60 lb bags of concrete in a cubic yard?
60 bags (27 ÷ 0.45); 45 bags of 80 lb.
How much does a cubic yard of concrete cost?
Typically $125–$200 delivered (2026 US range); the calculator defaults to $150 — edit it for your area.
Should I add extra for waste?
Yes, 10% is standard; 15% on uneven ground.
How thick should a concrete slab be?
4 inches for patios and walkways; 5–6 inches for driveways.
How long does concrete take to cure?
Walkable in 24–48 hours; full strength in about 28 days.